Skip to content

Cart

Your cart is empty

Don't miss anything!

Sign up for our newsletter and be the first to receive exclusive information, previews, and discounts.

Magnum Long Lead EDC

SKU: 01SC080
Sale price€26,95

Tax included. Shipping calculated at checkout

Only a few units left

Features

  • Overall length: 18.4 cm
  • Blade length: 8.0 cm
  • Blade thickness: 2.7 mm
  • Weight: 78.0 g
  • Blade material: 440B
  • Handle material: G10
  • Lock: Slipjoint
  • Satin-finished blade with flat grind
  • Nail nick opening
  • Lightly contoured handle scales
  • Tip-down clip (right)
Magnum Long Lead EDC
Magnum Long Lead EDC Sale price€26,95